A leading manufacturer of pharmaceutical and food packaging had their emissions stack blown down in high winds. Rightfully so, their first thought was to call Impact.
We had completed a full site survey within 2 hours of the call and began planning the job the same day. Meticulous planning was required and involved a team of engineers, cherry picker, scissor lift and crane to ensure prompt and safe installation.
The 864mm diameter 12m stack was just part of the problem. The base of the stack had also torn away a number of acoustic panels and a section of a 3mm thick fabricated transformer section.
Our remit was to get the job done safely and as quickly as possible whilst ensuring that the new stack is stable. This is exactly what we did and all within the time span given by the customer.