by user | Jul 1, 2019 | Case Studies
Impact Air Systems (our sister company) was called in to London’s largest undercover Material Recycling Facility (MRF) to improve the quality of the final product by removing the light fibre and debris from the material stream in order to boost its resale value....
by user | Jul 1, 2019 | Case Studies
For many years Impact Technical Services, have maintained LEV equipment throughout the site at Progress Rail, Sandiacre. Impact Technical Services we were engaged to produce a solution to the problem of excessive weld fume within one workshop. The Schotler Butt welder...
by user | Jul 1, 2019 | Case Studies
L.H. Woodhouse & Co Ltd is a well known supplier of temporary accommodation such as stables and grandstands at many of the leading equestrian events in the UK and Europe, including the 2012 Olympic Games in Greenwich. Impact Technical Services carried out an LEV...
by user | Jul 1, 2019 | Case Studies
A leading manufacturer of pharmaceutical and food packaging had their emissions stack blown down in high winds. Rightfully so, their first thought was to call Impact. We had completed a full site survey within 2 hours of the call and began planning the job the same...
by user | Jul 1, 2019 | Case Studies
J.W. Plant & Co Ltd (a flag manufacture and printing company) was experiencing issues controlling fume released during the ink heat curing process in its digital printers. The previous LEV (Local Exhaust Ventilation) system was not providing sufficient engineering...